Take Reading Public

Learn more about POP Dallas.

To support the Big Read Dallas, bcWORKSHOP was approached to create a graphic that maps the locations of spaces in Dallas good for reading. We took that one step further, and created an interactive web tool called Take Reading Public that shares public spaces friendly to reading in the city. By mapping the hundreds of parks, libraries, bookstores, and coffee shops in Dallas, we hope to reinforce a culture of reading by bringing it to the streets. This visual representation of local assets aims to bring positive activity to public spaces in Dallas and empower people through one of the best ways to build knowledge: reading. We also encourage users to share a message or photo about where they're reading with Twitter and Instagram, using #BigReadDallas.

The Big Read is a program of the National Endowment for the Arts, designed to restore reading to the center of American culture and encourage reading for pleasure and enlightenment. A partnership of D Magazine and Friends of the Dallas Public Library were awarded a grant to bring the Big Read to Dallas, and during the month of April the city will be engaged in reading one book together, Ray Bradbury's classic Fahrenheit 451 about a dystopian future in which books are banned. Over 20,000 copies are being distributed to Dallas ISD high school students this week.

Join us and thousands of other Dallas citizens by getting outside and reading!

Announcing bcSHOPFRONT

bcshopfront logo.jpg

Public design is an international movement which emphasizes community planning and creates positive changes through the built environment. bcWORKSHOP employs design to deliver and advocate for more livable communities. Local experiences and interests direct our work. We form strong relationships through place based product development, and work daily ensuring design is accessible and in service to all communities no matter their economic resources.

bcSHOPFRONT is an initiative of bcWORKSHOP featuring exhibits, talks, and activities related to the national public design movement and its impact on Dallas. It examines work of all scales- local, regional, state, and national- which promotes public design as a commonplace process. To position Dallas within the larger movement, the inaugural Spring 2013 series relates WORKSHOP’s local work to influential national institutions and practitioners.

Dallas' Neighborhood Map

Learn more about POP Dallas.

Active and resilient neighborhoods are the foundation of a successful city. POP [People Organizing Place] Dallas is the bcWORKSHOP public design effort to strengthen the social, economic, and physical health of Dallas’s neighborhoods. The POP City Map is a new tool that frames how we naturally organize our communities: as neighborhoods. The City Map builds awareness of our city, celebrates the diverse places that give it character and texture, shares critical data on a local scale, and creates a platform for dialogue about its history and future. Filling a void among the city’s existing local resources, the map will serve as a valuable resource for residents, planners, developers, government and other organizations planning the future of our city. Strengthening the identities of Dallas’s neighborhoods, and lessening the reliance on directional references (e.g., North Dallas), enables Dallasites to reconnect more personally and purposefully with place.

Michael Sorrell Joins bcWORKSHOP Board

Michael J. Sorrell, 34th President of Paul Quinn College, was recently named to the buildingcommunityWORKSHOP Board of Directors. President Sorrell joins Stephanie Hunt, co-founder of the Hunt Institute for Engineering & Humanity at SMU, Betsy del Monte, FAIA, local sustainability proponent, John Greenan of Central Dallas CDC, and Brent Brown, AIA, Founding Director of the bcWORKSHOP.

Michael J. Sorrell is the 34th President of Paul Quinn College and the reigning “HBCU Male President of the Year”. Under his leadership, Paul Quinn is experiencing one of the greatest turnarounds in the history of higher education. Among the college’s numerous accomplishments during President Sorrell’s tenure are: winning the “2011 HBCU of the Year” and the “2012 HBCU Student Government Association of the Year” titles; the demolition of 15 abandoned campus buildings; partnering with PepsiCo to transform the football field into the two acre “WE over Me Farm”; and achieving full accreditation with the Transnational Association of Christian Colleges and Schools (TRACS).

Michael Sorrell
Michael Sorrell

Michael received his J.D. and M.A. in Public Policy from Duke University.  While in law school, he was one of the founding members of the Journal of Gender Law & Policy and served as the Vice President of the Duke Bar AssociationMichael was a recipient of the Sloan Foundation Graduate Fellowship, which funded his studies at both Harvard University’s Kennedy School of Government (as a graduate fellow) and Duke University.  He graduated from Oberlin College with a B.A. in Government, served as Secretary-Treasurer of his senior class, was a two-time captain of the men’s varsity basketball team, and the school’s fifth all-time leading scorer.

Michael currently serves on the boards of Amegy Bank, Teach For America, the North Texas Public Broadcasting Company, Inc. and KIPP Truth Academy. He also has been recognized as one of the rising leaders in America by the Root Online Magazine through their “Root 100” and the Dallas Observer labeled him as one of Dallas’ “30 Most Interesting People”.  Among his other recognitions are: the Excellence in Education Distinguished Alumni Award from St. Ignatius College Prep in Chicago, Illinois; the A. Kenneth Pye Award for Educational Excellence from Duke University’s School of Law; and the TRACS Leadership Award.  He is a past recipient of the Dallas Urban League’s Torch for Community Leadership and both the President’s and C.B. Bunkley Awards from J.L. Turner Legal Association for his contributions to the Dallas legal community. President Sorrell is married to the former Natalie Jenkins and they have one son, two-year old Michael Augustus.

"We are very pleased that Michael has chosen to direct his considerable skills and leadership capacity towards advancing our mission of improving the livability and viability of communities," states WORKSHOP Director Brent Brown.

La Hacienda - Midway

Learn more about La Hacienda here.

The La Hacienda Casitas are quickly moving along with over half of the 56-units underway. Once the first eight homes were completed, work began on the remaining structures, consisting of eight different housing types, as well as on laundry facilities and other community buildings. Throughout this process care was taken to preserve existing trees across the site, providing need shade and a sense of age in the place. With construction scheduled to be complete in June 2013, the first five families have moved in, already filling this new community with life.

Congo Street Initiative

Learn more about our work in Dallas.

Congo_Street_04.jpg
Congo_Street_05.jpg

Congo Street is located just two miles from Dallas’s city center and three blocks from the Texas State Fair grounds in the East Dallas neighborhood of Jubilee Park, a 62-block area housing approximately 2,000 residents. With a density of 26 units per acre and houses averaging 600 square feet, Congo Street is a remnant of a socially and economically segregated time. Built around 1920, this small community of dwellings fell into disrepair with little attention from landlords, the surrounding neighborhood, or the City itself. Many current residents are the children and grandchildren of former renters and witness to multiple generations of its tight-knit community. The area continues to struggle with poverty, language barriers, low educational attainment, lack of job skills and vocational opportunities, and other challenges of lower-income communities.

The Congo Street Initiative started from the desire to help stabilize the home-ownership of five families on Congo Street, which was was forgotten and slated to be removed and redeveloped. The project grew through intense interaction with residents, stakeholders and partners into a collaborative design and redevelopment effort that produced three phases of work:

Holding House - With a common desire to remain on the street despite the urgent need to repair their homes, residents were hesitant to move forward with any plans that would displace them, even temporarily. The challenge was how to redevelop without relying upon relocation or incurring steep financial burden. bcWORKSHOP and the residents began by exploring alternative solutions. Through neighborhood meetings, the idea emerged to build a new residence on the street that would serve as a temporary home for each family during the evaluation and renovation/rebuilding of their homes. The Holding House model delivered a new value to this community by rebuilding it while retaining its social cohesion.

4537 - Holding House Completion - September 2008

De-constructing and re-constructing 5 family homes - Next, one by one, each family moved into the Holding House and was closely involved in the design and construction of the rebuilding of their homes. Instead of conventional demolition, each existing home was carefully deconstructed to preserve the materials. The incorporation of those reclaimed materials in the new home preserve the memory of the old home and the familial connections to each place. As the original structures measured 625 square feet  each, larger contemporary homes would have been inappropriate for the scale of the street. Thoughtful design driven by resident input resulted in functional, energy efficient homes with small footprints. The largest rebuilt home measures just 975 square feet distributed on two stories, accommodating a large, multigenerational household.

4529 - Frankie’s Home Completion - April 2009

4523 - Vernessia’s Home Completion - June 2009

4525 - Pat & Earnest’s Home Completion - September 2009

4539 - Fred’s Home Completion - May 2010

4533 - Ms. Ella’s Home Completion - August 2010

Green Street - Finally, a green infrastructure was implemented in two parts: 1) rebuilding the existing street into Dallas's first "Green Street" in order to incorporate stormwater management, retention, and bio-filtration while also making it a safer place for residents to live and play; and 2) adding solar power and solar thermal systems to the homes and meeting with residents (Power Plus) to assist in reducing their energy consumption and concomitant utility costs.

Solar Panel Installations Completed - February 2011

Green Street/Infrastructure Completion - November 2012

Beyond securing healthier indoor air quality, energy efficiency, and durability through sustainable building practices, all homes are also shaped to contribute to the social enrichment and livelihood of the street through features such as generous front porches and shared landscaping. The new Green Street design features a system that maximizes the filtration of rainfall and other runoff. The street width for traffic is reduced, limiting the use of impervious concrete and improving pedestrian safety.  All aspects if the initiative were optimized for multiple  dimensions of performance.

Attesting to the initiative’s design caliber, the project has received the following local and national design awards:

  • 2008 Dallas AIA Excellence in Community Design Award & Excellence in Sustainable Design Award (Holding House)
  • 2010 Dallas AIA Excellence in Community Design Award & Excellence in Sustainable Design Award (Ms. Ella's House)
  • 2010 AIA & U.S. Housing and Urban Development Department Secretary’s Award: Excellence in Community Informed Design (Congo Street)
  • 2011 SEED National Competition Winner (Congo Street)
  • 2013 Rudy Bruner Award for Urban Excellence Silver Medalist (Congo Street)

The Congo Street Initiative was a successful partnership between:

  • Congo Street families (a total of 27 people)
  • 20+ local resident volunteers
  • 65+ architecture students from the University of Texas at Arlington School of Architecture
  • Hundreds of volunteers in conjunction with AmeriCorps, Volunteers in Service to America, and several local service groups

Funding for the Congo Street home rebuilds included support from The Meadows Foundation, the City of Dallas, The Real Estate Council, Citi Community Development, and individual donors. The alternative energy systems are funded by Patriot Solar Power through a grant from the Sue Pope Foundation.

The Green Street was fully funded by the City of Dallas in partnership with the City of Dallas Public Works & Housing Departments, Southern Methodist University Bobby Lyle School of Engineering, Huitt-Zollars Engineering, and the Texas Trees Foundation.

Design for Community Advocates

Learn more about our Dallas work.

ACT (Advocates for Community Transformation) is an inner-city justice ministry based in West Dallas. ACT’s mission is to represent inner-city residents and mobilize volunteer legal teams in order to hold the owners of drug houses and abandoned properties accountable.  ACT’s legal work addresses this need through an ongoing casework approach supported by a strategy for structural prevention. In order to continue seeking transformation in these neighborhoods, ACT has determined that it is crucial to establish a permanent presence in West Dallas by building its own office. The new office will allow the organization to grow its work as well as demonstrate that ACT is committed long-term to the West Dallas community.

bcWORKSHOP has begun the process to design a new headquarters for Advocates for Community Transformation. This process has involved a series of staff and stakeholder meetings to determine project intentions, building program, and site strategy. The goal is to ensure that the building is driven by and enhances ACT’s mission and responds to the West Dallas context and community.

From a quality model exercise, priorities identified for the design included:

  • Interior qualities - The ACT team needs an environment that supports its work with quiet places to concentrate as well as team orientated spaces where collaborations flourish.  Carefully placed thresholds will allow ACT to showcase its work to visitors as well as maintain confidentiality of its strategy and clients. The office should feel welcoming, homelike and safe to all employees, guests and clients.
  • Safety/Security - The building and property needs to be safe and secure for all employees,guests and clients. Measures such as a secure building envelope, secure thresholds, clear separations between private and public spaces and additional security technology will all be explored to create the necessary level of safety for the site and building.
  • Engineering Performance - Heating and cooling systems should be chosen based on efficiency and life cycle costs. A robust and flexible IT infrastructure will insure technical connectivity throughout the entire building.
  • Community Values - The project should reflect ACT’s commitment to being a stable presence in the community as well as a safe place for its clients and staff. The building is a physical investment in the neighborhood that should reflect ACT’s mission to transform communities through thoughtful and diligent work.The scale and intimacy of the building should reflect its neighborhood.

Three schematic design options have been created by bcW and presented to key stakeholders.  In the upcoming months bcW, with direction from ACT and an approved budget, will further develop the building strategy. Once the schematic design is approved, bcWORKSHOP will compile a funding package featuring the proposed building, design process, and a preliminary budget.

Gurley Place Senior Housing

Learn more about our Making work in Dallas.

Over the past 60 years, the Jubilee Park neighborhood has experienced a shrinking population, a lack of affordable rental housing, and a deteriorating housing stock. Affordable senior housing options alleviate these trends by encouraging older, long-term residents to continue building relationships and investment in the community. Gurley Place is a 24-unit housing project for tenants over 55 that consists of 12 two-story buildings on a 0.9 acre site adjacent to the Jubilee Park and Community Center.

The design was developed through six public meetings with local residents and community stakeholders. The community set design parameters for the project and voiced concerns and local issues through activities such as design charrettes and in-depth discussions. These meetings ensured community goals were incorporated in the final design.

The project creates affordable housing opportunities by requiring that renters’ income does not exceed 80% of the median income of the neighborhood. The units’ design will decrease the residents’ utility bills by increasing the efficiency of water and energy systems. The project utilizes LEED Gold standards as a baseline and emphasizes low water use, highly durable materials, and superior indoor air quality to ensure the longevity of the building stock.

IMG_8536.jpg

Gurley Place was recognized with an Honorable Mention in the 2012 SEED Awards and is featured in the January/February 2013 issue of Texas Architect magazine.

La Hacienda First Phase

Learn more about La Hacienda Casitas and our work in the RGV.

Back on the La Hacienda Casitas site, the construction crews are in full swing wrapping up the first phase of homes, which are slated for completion in February 2013 and have already started the second phase, which are due in March 2013 .  By phasing the construction, the project team is able to work though details before proceeding with the remainder of the 56-unit development. As the next batch of homes are being framed, the laundry (the first of four community buildings) is also under way and the roadways have been completed. Once these initial houses are complete, the first residents of La Hacienda will be moving in to call this place their home.

sustainABLEhouse Under Construction

Learn more about sustainABLEhouse, and our work in Dallas and the RGV.

sahlogo.jpg

bcWORKSHOP is engaging in design processes to build several sustainABLEhouses in two diverse settings: Cameron County in the Rio Grande Valley and the Dolphin Heights neighborhood in Dallas.  Given the highly adaptable process of sustainABLEhouse, each setting provides a unique exploration of how the WORKSHOP can collaborate with partner families to design and build healthy, affordable homes.

Cameron County, Texas

  • In partnership with CDCB through their Colonia Redevelopment Program, eight families are engaging in the design and construction process across four different neighborhoods.
  • Each home conforms to basic design standards set forth by the Colonia Redevelopment Program and further shaped by input of the future residents through five meetings and ‘homework’ assignments.
  • The four homes average 864 square feet and accommodate an average family size of 2.5 people.
  • Construction is scheduled to begin in January 2013.

Dolphin Heights, Dallas, TX

  • This home serves as the 1st application of the initiative in the Dolphin Heights neighborhood.
  • Extensive community involvement and educational activities ensure that neighborhood voices are heard and contribute to the design.
  • This home, designed to meet rigorous energy standards, is 850 square feet and includes 2 bedrooms, 1 bathroom, large porch space, and the ability to expand the house in the future.
  • Construction is expected to be complete in December 2012 and we are currently seeking a homeowner partner. Contact us at 214.252.2900 for more details.

TEDx SMU + TEDx Kids

Learn more about POP Dallas.

On November 30 and December 1, 2012, bcWORKSHOP was invited to participate in the TEDxKids @ SMU (a special TED event for local middle school students) and TEDxSMU conferences to showcase our POP [People Organizing Place] Dallas initiative. Now in its fourth year, TEDxSMU brought a multitude of creative thinkers to the City Performance Hall in the Arts District to share and discover innovative ideas in technology, entertainment and design.

Following the conference's theme of re:TH!NK, over 400 attendees on both days shared their ideas for re-thinking the neighborhoods where they live, learn, work and play through activity cards, video interviews and good old-fashioned conversation. During the day, bcWORKSHOP created a compilation of Neighborhood Stories collected throughout the conference as well as a map of representing attendees' neighborhoods, which was screened at the end of the conference.

Conference participants were eager to share ideas for their own neighborhoods and absorb the ideas shared by others from around the city. With the POP City Map as a guide, attendees left armed with a strengthened understanding and commitment to place-making in Dallas.

La Bajada Stories

Learn more about Neighborhood Stories and POP Dallas.

The event celebrated this century-old Mexican American neighborhood.
The event celebrated this century-old Mexican American neighborhood.

View more photos of the event on our Facebook page.

On the evening of  November 17th, the first exhibit was held in La Bajada, a residential neighborhood dating back to the 1930s just west of Downtown Dallas. La Bajada's story was told through an exhibit of the events that shaped the neighborhood and a short film that featured interviews with neighborhood residents: Pete Martinez, Anita Martinez, Gloria Lopez, Ysidro Huerta, Sr. and Ysidro Huerta, Jr., John Zapata Gonzalez, and Felix Lozada. Guests had opportunities to contribute their own personal stories and memories about the neighborhood through recorded interviews and enjoyed tacos, tamales, and pastries from Taquería La Chilanga and La Estrella Bakery. By far the most popular activity was sledding down the slopes of the Trinity River levees, a common neighborhood recreation first enjoyed more than 60 years ago.

Neighborhood Stories: La Bajada was presented with the assistance of the Dallas Mexican American Historical League and the West Dallas Community Centers.

Casitas Foundations 101

Learn more about La Hacienda Casitas and our work in the RGV.

By Emily Axtman

Phase 1 of La Hacienda Casitas is underway! Site work has been going on for a few months now and the streets are beginning to take shape, as seen below. Up until now, the site progress has been horizontal: dirt has been moved around and wet/dry infrastructure has been installed. Although I've seen some pretty high mounds of dirt, nothing as vertical or as exciting as a house has started...until now!

Thus far, a total of 8 foundations have been poured. So what has been involved in this process?

Standing at the northwest street corner facing the building pad of the first 10 houses.

Standing at the northwest street corner facing the building pad of the first 10 houses.

Preparing the site:

In order to prep the site for the foundations, the Phase 1 area was first cleared 3', seen again in the photo above.

Foundation-Prep.jpg

Preparing the pad:

(1) Due to soil instability in the Valley, 3' of select fill was required under each unit to ensure proper density and compaction ability. Select fill is used when native soils are not capable of adequately bearing the weight of the structure that will be built in that location.

(2) The select fill was then compacted in 6" deep increments, referred to as lifts. This process further ensures proper density and compaction.

(3) Once the fill was tested and the form-work constructed, a trencher was used to cut out the foundation lines. At this point, it looked like this:

Pani-2-copy.jpg

I know what you're thinking. This photo looks the same as the last picture! If you look more closely you'll notice the built-up select fill and the beginning of the form-work.

form-work-copy.jpg

Preparing the foundation:

The the select fill is piled high from the trenching while perimeters of the foundation are edged with form-work. After the form-work and trenching are complete, plumbing for the kitchen, bathroom, and utilities is roughed in. A plastic vapor barrier is then laid over the padding, tucked into the trenches and then stapled to the form-work. It is very important that the concrete be cast in a dry protected barrier and kept away from the soil. Continuous exposure to water and moisture can cause cracking in the concrete, leading to structural instability.

The rebar is assembled in stages onsite and set into the trenches first, then laid in a grid pattern on top of the padding. Because concrete has low tensile strength, reinforcement must be used that is high in tensile strength, such as steel rebar. Chairs, the dots in yellow above, are used to raise the rebar 2-3" above the padding. This ensures that the concrete will adhere to the rebar properly and surround it evenly. Once the rebar is inspected, it's time for the fun part... CONCRETE!

Concrete-Proc.jpg

The concrete is spread evenly over the padding and into the trenches, then vibrated at the form-work edges to help the aggregate settle and release any air pockets.

Concrete is a composite material made up of an aggregate (such as stone), cement and water. When water is mixed with the dry aggregate and cement, a chemical process called hydration occurs, enabling the mixture to be molded and formed before hardening.

The timing and craft of pouring the foundation is key to the accuracy of the houses. Speaking to one of the foremen on-site, he said, "Pouring the foundations is the most stressful part of the process. Once we pour, it's final; so everything has to be right."

Concrete-2.jpg

Once the concrete has been distributed evenly, it's roughly smoothed using a screed. As the larger aggregate begins to settle, a bull float is used to smooth the top layer of the finer aggregate. To complete the process, edge and finish trowels are used to refine the concrete surfaces.

As I learned at 5:30am in the morning, pouring concrete is an early event. In order for the concrete to set, the air temperature can't be too hot or too cold. If the temperature is below 50 degrees, the hydration process slows down; if too hot, hydration occurs too fast, causing differential temperatures in the concrete that can lead to cracking, as well as compromising the final strength of the concrete. Due to the Valley's high temperatures, it's important to start as early as possible to beat the heat.

Prior to any foundation pours, a sample is taken from the concrete trucks and tested later to verify the strength and composition of the mixture. According to the tester, the foundations will cure enough in about 3 days to start framing. Fully cured concrete takes about 21 days.

Denton Neighborhood Empowerment Summit

Learn more about POP Dallas.

On October 27, 2012, bcWORKSHOP supported the City of Denton Neighborhood Planning Program's efforts to provide residents with tools to affect positive change in their neighborhoods by engaging them with the POP [People Organizing Place] Dallas Toolkit at the fourth annual Neighborhood Empowerment Summit.

Local advocates first learned about the Toolkit as a common language that guides people in understanding their physical and social environments, as well as provides them with tools to position themselves as effective advocates for change.  Next, the participants had to critically reflect on what they had done and were already doing in their neighborhood, allowing them to develop an informed strategy for advancing their interests.

The Toolkit requires active engagement, so bcWORKSHOP challenged participants to critically reflect on their daily behavior through several high-energy activities.  They were first given cards on which they wrote stories of what they have done in their communities related to a specific tool, and shared these stories in small groups.  In the same groups, they collectively chose one tool for a reflection exercise.  Group members were responsible for dissecting the story using the Toolkit’s four-step process by identifying the scale, naming the method used, and evaluating the tool's success.  The exercise generated productive dialogue, as groups discussed other tools that could be more effective and how their relationship with the physical environment influenced their actions.

To emphasize that sharing ideas and stories is an integral part of the Toolkit, bcW concluded the session by having each group not only present their discussion, but also defend the reasons their tool was appropriate for discovering, sharing, or making.

Neighborhood Stories - Arts District

Learn more about POP Dallas and Neighborhood Stories.

On October 27-28, 2012, bcWORKSHOP was a part of a monumental project for Dallas: the grand opening of Klyde Warren Park. The celebration commemorated an innovative park that decks over a portion of Woodall Rodgers Freeway, providing valuable new civic space and connecting Uptown and the Dallas Arts District.

bcWORKSHOP had a substantial presence at the park opening, engaging visitors on Harwood Street around our POP [People Organizing Place] Dallas initiative as they passed between the new park and the Arts District. The centerpiece was a Dallas Neighborhood Stories exhibit inside our 45’ retrofitted shipping container that examined the evolution of today’s Arts District from its origins as the juncture of the Freedman’s Town/North Dallas, Little Mexico, and Ross Avenue neighborhoods, and how major interventions - the construction of Central Expressway, the construction of Woodall Rodgers Freeway, and the master plan for the Arts District - affected physical and social change.

The POP City Map also made an appearance; more than 200 people marked their Dallas neighborhoods, with dozens more showing their pride in places from Irving and Lancaster to Brazil and France. Finally, hundreds of revelers shared pictures and stories about where they live on the container itself and on camera in the Story House.

The weekend affirmed how strongly people identify and connect with their neighborhoods as well as the importance of understanding the decisions and actions that have shaped our city over time. We had a great time at the opening and look forward to bringing our exhibit back to the Arts District soon!

A Designer's Paradise?

Learn more about La Hacienda and our work in the RGV.

By Emily Axtman

So what is bcWORKSHOP working on in the Valley besides La Hacienda Casitas?

The short answer: a lot.

To give some perspective about architecture practices in the Valley:

The city of Dallas, at a population of about 1.2 million, has 301 professional architecture practices according to the National Council of Architectural Registration Boards (NCARB) 2011 data. The city of Brownsville, at a population of 178,500, has 5 professional architecture practices.

Dallas averages 1 architecture firm for every 3,300 people. Brownsville averages 1 architect firm for every 35,600 people. So what's the big deal? Dallas has 10 times the capacity of people working towards providing better housing, public spaces and development within the city. Brownsville is in need of a greater design capacity and this is where bcWORKSHOP comes in.

Maggie Winter, a bcWORKSHOP designer, has been working toward implementing improvements for the quality of life in the LRGV since September 2011. Her projects have ranged from city-wide planning to housing and broader community development.

Justin Tirsun, a former VISTA at bcW, has been a part of the LRGV team since July 2012. Justin's main focus in the Valley has been policy research and development in the Colonias, as well as the Belden Trail. Among all of the projects, I have had the opportunity to work on the Alegria House.

Alegria House, front elevation.

Alegria House, front elevation.

bcWORKSHOP has been working with Ms. Alegria to design a new home for her and her 3 children. The Alegrias currently live in a mobile home without running water or electricity. Recently, Ms. Alegria's son was paralyzed in an accident, making accessibility part of their housing needs. Working within CDCB's Colonia Redevelopment Program, bcWORKSHOP has designed a home that will meet their needs and provide a healthy living environment. Construction is slated to begin in November!

The Colonia Redevelopment Program is a reconstruction & rehabilitation service for homeowners in Colonias currently living in homes that are not meeting their basic needs. Based on the sustainABLEhouse model,  bcW is teaming up with CDCB to offer a custom design service to the program. This opportunity directly involves the homeowners in the design and construction of their new home while remaining within the parameters of the Colonia Redevelopment Program. The bcW LRGV office is currently working with 4 families to design homes that will accommodate their needs, be energy efficient, and provide healthy living environments. We are thrilled to be working so closely with all of these families!

So now back to that OTHER housing project. What's going on with La Hacienda?! I'm excited to bring the news that the La Hacienda site has been under construction for 4 weeks now. With the infrastructural work underway (eg: water, sewer and fire lines; site-drainage and street layout) the first 8 homes will be under construction in the next couple weeks. The foundations have been staked and completion of these units is scheduled for mid-January. Stay tuned over these next few weeks: the houses are on their way!

La Hacienda site on 10/1/2012 facing east from Paloma Ln. 

La Hacienda site on 10/1/2012 facing east from Paloma Ln. 

BigBang! 2012

Learn more about POP Dallas and Neighborhood Stories.

bcWORKSHOP provided a variety of activities concerning Dallas neighborhoods at the 2012 bigBANG!, organized by Dallas Social Venture Partners. Located in Union Station, this day-long forum convened the thinkers and doers of the city for an opportunity to catalyze positive impact. Many components of the POP Dallas initiative were engaged by event participants, including the POP City Map which allowed attendees to identify and mark their neighborhoods. The Story House also made its debut, and new interviews were collected inside of it in collaboration with educational nonprofit Commit!, an organization dedicated to realizing children's full potential. Fifteen different neighborhoods were represented with 30 new recorded interviews. Next door, bcFELLOWs led two high-energy work sessions utilizing the POP Toolkit, empowering participants to think about the changes they can affect in their own communities.

Cliff Temple Community Garden

Learn more about our Making work in Dallas.

From 2011 to 2012, bcWORKSHOP partnered with Cliff Temple Baptist Church in North Oak Cliff to improve their community garden, making the garden more functional as well as more habitable for social events and gatherings. bcW was approached by Wes Keyes, the church’s Minister of Missions, for design input on facilities to make the garden more usable and secure.

The Cliff Temple Community Garden was established three years ago, and serves as a part of The Well Ministry, a faith based community group that supports those with severe mental illness. Many members of the Well work a number of plots in the garden and directly contribute to the Goslin Opportunity Center and food pantry of the church.  Other plots are tended by gardeners from the Cliff Temple congregation and other local community members.

From September to November 2011, through a number of garden workdays, meetings, and surveys, bcWORKSHOP and garden users documented activities that took place in the garden, identified and prioritized needs to better accommodate these and other desired activities. Specific needs included a toolshed to help organize and secure their tools, a bathroom facility to allow gardeners and guests to spend more time in the garden, and a social space to allow more frequent gatherings and events.

In order to take advantage of the existing natural elements of the site, and to minimize cost, it was proposed to make a number of small interventions in the garden to create nodes of storage and activity that the users could organize around.

Building began in February 2012. A toolshed was constructed and installed in the garden in March. A social space was designed to include: three shade sails to augment the shade from existing trees and shield the social space from rain; a large community table, constructed to form a center piece for the space; and donated limestone assembled into a dry-stacked wall, to allow for seating around the table. These elements were completed in June. The remaining construction is focused on a shed structure which will house a self-contained composting toilet.

With a combination of volunteer labor from the garden and bcWORKSHOP, build-days have been held on multiple Saturdays. Groups of gardeners and bcW volunteers have worked through extreme weather conditions, from mid-30 degree temperatures with high winds to days of over 100 degrees. Rain has also plagued the construction schedule with delays. However, through much hard work, the project will be completed by the end of 2012.

Significant progress was made toward completing the remaining construction in October 2012. As the project reaches this stage of completion, bcWORKSHOP is transitioning from designer and leader of construction efforts, to support for the maintenance and future garden enhancements.

The Cottages at Hickory Crossing

Learn more about The Cottages.

Positioned at the gateway to downtown Dallas, The Cottages at Hickory Crossing will provide an innovative union of permanent housing and support services for the fifty most chronic cases of homelessness in Dallas. The integration of thoughtful design and robust services become a comprehensive approach to address the many challenges faced by residents. To best understand the needs of future residents and service providers, the pre-design process included a combination of research, focus group charrettes, and comprehensive engagement of stakeholders in the decision-making process.

The Cottages at Hickory Crossing design re-imagines traditional models by abandoning compartmentalized forms for a composition of separate but linked structures. Design components include:

  • Common green and a series of courtyards: provide flexible space for activities and neighbor interaction. 
  • Fifty, 430- square-foot cottage residences: encourage stronger personal identity; locally pre-fabricated.
  • 4,000-square-foot support-services building: a series of small buildings under one “porch” roof, encouraging frequent resident use and reducing operational costs by centralizing resources.

The project serves as a model for sustainable urban living by maximizing open space, incorporating on-site solar energy technologies, and integrating rainwater collection. While also producing a durable return on investment, these green strategies and activities create a supportive, healthy, and inviting environment. Preliminary modeling anticipates a LEED Platinum rating.

Project partners include: CitySquare, Central Dallas Community Development Corporation, Metrocare Services, Metro Dallas Homeless Alliance, Dallas County Criminal Justice System, UT Southwestern Medical Center, and initial funding provided by the W.W. Caruth Jr. Foundation at Communities Foundation of Texas.

For information on funding or other opportunities, please contact Shawn Wills, Chief Development Officer at CitySquare.

In September 2012, the Dallas Chapter of the American Institute of Architects honored the project with an Unbuilt Design Award.